The Miramar Clearwell Improvements projects included multiple scopes of work at the Miramar Water Treatment Plant in San Diego. The replacement of Clearwells 1 and 2 added six million gallons of capacity at the facility that serves the water needs for most areas of the city north of Interstate 8.
In addition, Shimmick constructed a new chlorine contact chamber with adjoining lift station, an operation and maintenance building, a new security guard shack with surveillance equipment and fences, a pump station electrical building, a pre-fabricated storage building, miscellaneous vaults and structures. Shimmick are also installed a one-megawatt solar power system.