Smith Canal Gate

Home > Our Solutions > Water Resources > Smith Canal Gate

Smith Canal Gate

The Smith Canal Gate project includes a fixed cellular sheet pile floodwall, miter gate structure with temporary in-water works and shoring, improvements to Dad’s Point, and additional access improvements to the Stockton Golf and Country Club.

Project Details

Location:Stockton, CA
Amount: $49.4M
Delivery Method:Bid-Build
Client Name:San Joaquin Flood Control District
Duration: 2020-2022