This project was located in the remote area of the Sunol-Ohlone Regional Wilderness. Project scope included construction of a soldier pile wall for land stabilization, 27,000 SF soil nail wall for new fish ladder/fish intake structures, 30,000 CY forebay excavation, 300 LF fish ladder and fish intake structure (8,000 CY of concrete), diversion structure with […]
Shimmick was selected to construct 8 miles of flood control wall, or T-wall, on top of the existing levee which is part of the section known as LPV 146.
This $50 Million project includes a fixed cellular sheet pile floodwall, miter gate structure including temporary in-water works and shoring, Improvements to Dad’s Point, and additional access improvements to the Stockton Golf and Country Club.
Shimmick provided engineering, procurement and construction for the San Roque project located in a remote region of North Luzon in the Philippines. The principal features of this $1.2-billion project include a 650-ft-high earth and rockfill dam – one of Asia’s tallest – a three-unit 345-megawatt powerhouse, a 452,000 cfs gated concrete chute spillway, and 4.5 miles […]