News

Our Solutions

Soledad Wastewater Treatment Plant

/
The Soledad Wastewater Plant consisted of three sets of ponds, including

Sunol Valley Water Treatment Plant Expansion and Reservoir

/
The Sunol Valley Water Treatment Plant was a 120 MGD facility. The facility

North City Plant Expansion Site Work and Ozone Relocation

The project consists of the expansion of the North City Water Reclamation

P2-122 Headworks Modifications at Plant 2

The project includes several elements necessary to separate the existing

Pier G Berths Terminal Redevelopment

/
North Slip Backlands Development is part of The Pier G Redevelopment

Pier G East Berth Terminal Demolition

/
The Pier G Demolition project consisted of a full demolition of an existing

Pure Water Oceanside Advanced Water Purification Facility

Pure Water Oceanside is the first operating advanced water purification

Robert B. Diemer Water Treatment Plant

/
Shimmick's contract included constructing an ozone generation building, ozone contactors, contactor influent and effluent conduits, contactor rejection tunnel, liquid oxygen storage and feed system, and a chemical feed facilities.

San Vicente Dam Raise

/
The San Vicente Dam Raise was part of the Emergency Storage Project, a
1 2 3 4 5